9 of 13 Windows Installed

July 19th, 2006

We’re busily working our way around the house — finishing sheathing, nailing on tarpaper, installing windows, and putting on the top trim and drip edge. To do the front of the house (with the high gable end) we needed scaffolding stacked 5-high. Moving that around and building it up isn’t fun, but it’s the only way to move ahead.

Yesterday and today we stopped work at 1 pm due to the high temperatures. Hopefully this heat wave will pass soon, but if it doesn’t we’ll just continue to work in the cooler part of the day. Next week a sub-contractor will hang the siding while we shingle the roof.

I’ve got 5 Andersen double-hung windows on the front of the house. They were a little more finicky to install than the awning windows, but stilll not difficult considering their large size (they’re practically floor-to-ceiling windows).

It looks more like a house every day. Click to enlarge:

house windows installed

Entry Filed under: construction

WordPress database error: [Can't open file: 'wp_comments.MYI' (errno: 144)]
SELECT * FROM wp_comments WHERE comment_post_ID = '31' AND comment_approved = '1' ORDER BY comment_date

Leave a Comment

hidden

Some HTML allowed:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>

Trackback this post  |  Subscribe to the comments via RSS Feed


Calendar

July 2006
M T W T F S S
« Jun   Aug »
 12
3456789
10111213141516
17181920212223
24252627282930
31  

Most Recent Posts