Second Story

May 19th, 2006

As I mentioned in the last post, we’ve been busy framing the walls on the second floor. The main room up there is the bedroom/office, and all 4 of those walls are up. All the window openings match the first floor, although that’s hard to see in the photos.

We nailed on the bottom run of sheathing downstairs to strengthen the structure — and it worked well. Even with all our work upstairs the house feels rock solid. The rough openings for the windows and doors will be cut out from the inside later.


Entry Filed under: construction

WordPress database error: [Can't open file: 'wp_comments.MYI' (errno: 144)]
SELECT * FROM wp_comments WHERE comment_post_ID = '20' AND comment_approved = '1' ORDER BY comment_date

Leave a Comment

hidden

Some HTML allowed:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>

Trackback this post  |  Subscribe to the comments via RSS Feed


Calendar

May 2006
M T W T F S S
« Apr   Jun »
1234567
891011121314
15161718192021
22232425262728
293031  

Most Recent Posts