We poured the concrete footings this morning. Contractor Marshall ordered 4 cubic yards of concrete and his calculations were right on what we needed. The little extra went into a landing for the front steps.

Lee from T&W Block delivered the concrete in a mixer truck, and he was a big help. He jockeyed the truck around so we didn’t have to muscle the stuff too much.